Fab
The single hardest facility in the world to build from scratch
Imagine a factory so sensitive that a single stray dust particle can ruin the product, requiring air cleaner than a hospital operating theatre, machines costing hundreds of millions of dollars each, and years of construction before it produces a single usable unit. That factory is a fab, short for fabrication plant, the place where raw silicon wafers are actually turned into working semiconductor circuits.
Inside a fab, silicon wafers go through hundreds of precise steps, layering, etching and doping microscopic circuit patterns onto their surface, using equipment so advanced that only a handful of countries in the world can supply the most cutting edge machines. This is why fabs sit at the very top of the semiconductor value chain in terms of both capital cost and technical difficulty, far beyond what ATMP or OSAT facilities require.
Tata Electronics' fab under construction in Dholera, Gujarat, is India's first real attempt at this hardest layer of the value chain, targeted for commissioning around 2028, a timeline that itself reflects just how much longer a fab takes to build compared to the ATMP and OSAT facilities that have already reached commercial production in India.
Related concepts
ATMP & OSAT
Why India's chip story started with packaging, not fabrication
India Semiconductor Mission & PLI
The economics behind India's biggest industrial bet in a generation
DLI: Design Linked Incentive
Paying India's chip design startups to design, not just to build