Right of Way for Telecom Infrastructure

The unglamorous permission process that decides whether a fibre cable can actually be laid under your street

Telecom·advanced·1 min read·Updated July 2026
Permissions for laying cables/erecting towers on public/private land
Governs

Imagine a telecom operator wanting to lay fibre optic cable along a public road or erect a new mobile tower, and needing formal permission from potentially dozens of separate local authorities, municipal corporations, state public works departments, railway authorities, each with their own approval process, fees and timelines, before a single metre of cable can actually be laid. Right of Way, RoW, rules exist specifically to govern exactly this permission process, and historically inconsistent, slow RoW approval across different states and municipalities has been a genuine, persistent bottleneck for Indian telecom infrastructure expansion.

The problem this created was genuinely significant, an operator trying to extend fibre or tower coverage across multiple states could face wildly different approval timelines, fee structures and documentation requirements in each jurisdiction, turning what should be a straightforward infrastructure build-out into a genuinely complex, unpredictable multi-jurisdictional negotiation.

Reforms under the Telecommunications Act 2023, covered elsewhere on this site, and associated RoW rules aimed specifically to standardise this process nationally, setting common timelines and fee caps that local authorities are expected to follow, reducing the jurisdiction-by-jurisdiction unpredictability that had previously slowed network expansion, particularly the fibre-laying work underpinning both BharatNet and 5G backhaul covered elsewhere on this site.

This unglamorous regulatory reform matters directly to how fast India's 5G rollout and rural broadband expansion, both covered elsewhere on this site, can actually proceed, no amount of operator capital investment or spectrum availability translates into actual network coverage if the physical permission to lay cable or erect towers remains stuck in slow, inconsistent local approval processes, exactly why RoW reform sits quietly but genuinely essentially underneath nearly every other telecom infrastructure story covered on this page.